Commercial & Industrial
- Load balancing and peak shaving
- Energy cost optimization
- Maximized solar self-consumption
- Backup power solutions
We design, build and integrate battery energy storage systems into transmission and distribution networks.
Complete project delivery – from initial engineering and construction to grid connection.
Battery energy storage system integration into DSO and TSO networks.
Systems prepared for balancing and direct participation in electricity markets.
Commissioning, testing and configuration in accordance with manufacturer requirements.
30 MW/60 MWh BESS park (under construction)
Assessment of grid connection options to DSO and TSO networks. Analysis of grid constraints and battery energy storage system integration requirements.
COMMERCIAL & INDUSTRIAL
UTILITY-SCALE PROJECTS