"Wiso Engineering" solar park 5,79 MW

The Energia Futura team completed the construction of a 5.79 MW solar park in Balbieriškis, with WiSo Engineering acting as the general contractor.

The park features a modern single-axis tracking system, allowing the solar modules to follow the sun’s movement and increase energy generation. Grid connection works were also completed, including the reconstruction of a spare bay and the installation of more than 2 km of power line connecting the park to the Balbieriškis substation. The control system solutions for the project were implemented by the TSPI team.

The solar park is now successfully generating renewable electricity.